Installation of foundation for a new substation and switchgear & Excavation of trench lines to install electric supply cable for MVV Environment Ridham Ltd.
Installation of concrete foundations for UK Power Networks transformer and switchgear within a fenced compound. Including excavation of a connection pit for connection to the existing HV cable and installation of a new power supply cable and earthing infrastructure. Also installed a new power kiosk for the landowner.
Testimonial
‘We contracted DMD Plant to build the infrastructure to support a new electricity supply substation. They were super-efficient, came in on budget and left the area in a very tidy state. It was also noted by UKPN that their work was of very high quality. We are currently looking at contracting them for further works.’
E&D Phizacklea
Standinghall Park, West Sussex