Installation of 355mm drainage pipeline with an outfall through a tidal wall, Kent

This was a large project spanning three months which included the installation of an electrically automated pump set up and the installation of a 63mm pressured pipeline and 355mm gravity drainage line with auger boring installation under the existing surface water stream and tidal wall. DMD Plant is returning in 2022 to undertake the lining of a surface water lagoon.

Project Photos

Other Projects